DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE WEST LOS ANGELES COLLEGE FACILITIES MASTER PLAN PROJECT

LEAD AGENCY: LOS ANGELES COMMUNITY COLLEGE DISTRICT
STATE CLEARINGHOUSE No. 2003011018
SITE LOCATION: WEST LOS ANGELES COLLEGE, 9000 OVERLAND AVENUE.

The Los Angeles Community College District and West Los Angeles College are proposing to adopt a Facilities Master Plan to guide campus development through 2022. A Draft EIR has been prepared and will be circulated for a period of 60 days, from July 23, 2003 to September 22, 2003.

Draft Environmental Impact Report Table of Contents

Graphic exhibits from the Draft Environmental Impact Report are available from this page. Files are provided as PDFs. Click here to view the Table of Contents for the text. Click here to view the Table of Contents for the text of the document.

List of Figures

Figure III-1 Regional Location Map (188k)

Figure III-2 Project Location Map (668k)

Figure III-3 Existing Campus (580k)

Figure III-4 Phase I Development (316k)

Figure III-5 Phase II Development (268k)

Figure III-6 Potential Second Access Locations and Alignments (6.1mb)

Figure IV-1 Surrounding Land Use (4.3mb)

Figure IV-2 Related Projects Location Map (256k)

Figure V.A-1 Photo Location Key (484k)

Figure V.A-2 Views of the Project Area (4.4mb)

Figure V.A-3 Views of the Campus (3.8mb)

Figure V.A-4 Northerly Views from South of Stocker Street (3.5mb)

Figure V.A-5 Northwesterly Views from Private Properties on Saint James Drive (4.7mb)

Figure V.A-6 Views Along Freshman Drive Near the Football Field (4.6mb)

Figure V.A-7 Views Along Freshman Drive Near the Tennis Courts (3.9mb)

Figure V.A-8 Views Along Freshman Drive Near the Baseball Field (3.4mb)

Figure V.A-9 Views of the Drainage Channel Paralleling Freshman Drive (3.4mb)

Figure V.A-10 View Profile Location Key (528k)

Figure V.A-11 View Profiles A & B (156k)

Figure V.A-12 View Profile C (96k)

Figure V.C-1 Vegetation Communities at Baldwin Hills (7.8mb)

Figure V.E-1 Regional Fault Map (180k)

Figure V.E-2 Site Geology and Seismic Hazards Map (704k)

Figure V.F-1 Location of Hazardous Materials (344k)

Figure V.G-1 Existing Hydrology Map (540k)

Figure V.G-2 Los Angeles Coastal Groundwater Basins (1.6mb)

Figure V.G-3 Proposed Hydrology Map (976k)

Figure V.J-1 Long-Term Monitoring Locations (564k)

Figure V.J-2 Typical Construction Noise Levels (948k)

Figure V.K-1 Police and Fire Stations (276k)

Figure V.M-1 Traffic Study Intersections (256k)

Figure V.M-2 Existing (Year 2002) Weekday AM Peak Hour Traffic Volumes (320k)

Figure V.M-3 Existing (Year 2002) Weekday PM Peak Hour Traffic Volumes (324k)

Figure V.M-4 2015 No Project Weekday AM Peak Hour Traffic Volumes (332k)

Figure V.M-5 2015 No Project Weekday PM Peak Hour Traffic Volumes (336k)

Figure V.M-6 2015 With Project Weekday AM Peak Hour Traffic Volumes (336k)

Figure V.M-7 2015 With Project Weekday PM Peak Hour Traffic Volumes (320k)

Figure V.M-8 2022 No Project Weekday AM Peak Hour Volumes (320k)

Figure V.M-9 2022 No Project Weekday PM Peak Hour Volumes (320k)

Figure V.M-10 2022 With Project (No Second Access) Weekday AM Peak Hour Traffic Volumes (324k)

Figure V.M-11 2022 With Project (No Second Access) Weekday PM Peak Hour Traffic Volumes (324k)

Figure V.M-12 On-Campus Circulation Comparison (732k)